Various types of ERAs | Elements of ERAs process | Summarization | |
Traditional ERAs | Health risk assessment | Analyzing the relationships between the dose of hazardous/toxic substance and the response of human health | Despite these variations, all types of traditional ERAs can be summarized by four steps: Hazard identification, risk analysis, risk evaluation/ characteristics, and risk management |
Accidents risk assessment | Using some mathematic models to estimate the risk probability and its corresponding consequence | ||
Natural disaster risk assessment | Analyzing the relationship between vulnerability to disaster and other hazards | ||
Regional comprehensive risk assessments | Integrating and ranking of different types of environmental risks in a given research region | ||
ERA for DMP | Risk evaluation based on RCB | Using a quantitative economical method “BCA” as the main technical tool to support the selection and determination of any preferred managerial option from risk perspective. | Despite the decision-making tool are different, these processes can be summarized in five steps: Problem identification, alternatives formulation, decision-making criteria and tool selection, alternatives evaluation and ranking, and preferred alternative selection. |
CRA based on the methods of MCDA | Considering multiple criteria including economical, ecological, environmental, social and other factors in decision-making options and comparing risk related with different options based on MCDA methods to determine the optimal managerial option from risk perspective. |